The Holly and the Iced Tea

Total: 19.0 hours (1140 min)
Date Start End Minutes Activity Pictures
2025-11-11 13:15 15:15 120 Milling the sides.
Marked edges to maintain 4-way grain wrap.
Session photo
2025-11-11 21:15 22:15 60 Milled second set of sides; resawed veneer for front. Session photo
2025-11-13 75 Cutting pieces for cracked ice front.
Rough bandsaw; shot to final size. Chevalet next time for multiples? Consider reshaping 13/14/16 to avoid common point.
Session photoSession photo
2025-11-14 45 Gluing up cracked ice veneers
Slow going.
Session photo
2025-11-15 60 Continue gluing up front.
2025-11-15 60 Complete first veneer panel; start second. Session photoSession photo
2025-11-16 60 Thickness front. Miters on the sides. Session photoSession photoSession photo
2025-11-16 30 Cut rabbet and dado in each side.
For bottom and dividers respectively.
2025-11-16 90 Plywood base; interior dividers Session photoSession photo
2025-11-16 45 Flushed sides to dividers; stock for caps.
2025-11-16 15 Glue caps on sides. Session photo
2025-11-17 40 Flushing caps; paring miters on caps. Session photo
2025-11-18 75 Inlay metal into front
Titanium this time.
Session photoSession photo
2025-11-19 30 Make holly dust; apply mastic to gaps. Session photo
2025-11-20 45 Sanding front to level mastic; polish metal lettering. Session photoSession photo
2025-11-23 60 Futz with fit on miters; recut base; veneer base.
I always forget how much I dislike miters.
2025-11-29 120 Prefinish cherry dividers; flush inside of holly sides; surface prep bottom; attach book cloth to bottom.
2025-11-30 11:20 12:00 40 Prefinish inside. Session photo
2025-11-30 13:30 13:50 20 First glue up. Session photo
2025-12-01 20 Final glue up Session photo
2025-12-02 30 Final finish and wax.
Fill with tea, and I'm done.
Session photo

← Back to build log